Resurfacing Boileau Road
- Resurfacing of Boileau Road June/July 2019
- The following letter was sent by Ealing Council local councillors earlier this month about resurfacing works in Boileau Road.
'We are pleased to be able to confirm that micro-surfacing* will be taking place in Boileau Road (Station Road to Corringway) as shown in the drawing attached. The attached letter# sets out our plans for delivering these works within your ward between the following dates:
• Phase 1 – Preparatory Works during June to July 2019 between 08:00 to 16:00
We may need to carry out minor repairs to kerbs or gullies or minor pre-patching work before the laying process can be carried out. These works are not normally disruptive, but we will need to suspend some parking areas.
• Phase 2 – Micro-surfacing is provisionally planned week commencing 14th July 2019 between 09:00 and 17:00.
Notices will be displayed on the street to confirm the actual works date. Shortly before works commence no-parking cones will be set out in the street. Please note, access will not be permitted during the laying process.
Please find attached# a copy of the notification letter which is due to be distributed to residents, and we will also liaise with nearby schools or other stakeholders affected by these works.'
#The letters referred to are below.
Click here to download this file
Click here to download this file
*See the link below for more information about micro-surfacing as employed by the London Borough of Barnet. LBE’s system may or may not be a similar process.
https://www.barnet.gov.uk/parking-roads-and-pavements-old/roads-and-pavements-barnet/planned-road-and-pavement-improvements-0